THE HISTORIC KLAMATH RENOVATION
san francisco
Partnering with RMW architecture + interiors in 2020, we worked to develop a code compliance design analysis for this unique building opportunity on a 1914 ferry boat to be docked in San Francisco at Pier 9 with office and meeting spaces and a publicly accessible park space on the roof deck of boat.
During the pandemic, the project moved forward into design development and our team rejoined the RMW team to oversee design development and the final construction detailing package as well as construction administration remotely.
The project was constructed in Stockton, California and relocated to the final permanent dock slip at Pier 9 in 2023.
For more project information see: https://rmw.com/projects/the-historic-klamath/
LOCATION
san francisco
SIZE
25,000 sf
SERVICES
architectural design detailing
exterior detailing
interior design
code analysis
project credits
a&d firm
RMW architecture + interiors
The Craft [interior architecture] as contractor
design project team
Terry Kwik, Hakee Chang, Denise M. Darrin, Jenna Szczech, Kristen Beus, Scarlet Entwistle, Michael Thomas, Matt Cottrill
Argonautics - Marine Engineering
Forell | Elsesser - Structural Engineering
AlfaTech - MEP
construction team
Spediacci Construction
furniture team
Not Disclosed